r6 - 14 Jul 2007 - 21:20:00 - Main.jillYou are here: TWiki >  Main Web > MajorTaskList

Major Task List -- No particular order

Optics & Alignment

  • Glue Prism earthquake mounts; finish blackening sides CLOSED
  • Assemble cal box CLOSED
  • glue relay mirror for cal box CLOSED
  • set up cal box in spectrograph and relay optics CLOSED
  • set up along-telescope-axis laser CLOSED
  • align injection optics CLOSED
  • focus injection optics CLOSED
  • install little turn mirror and adjust it CLOSED
  • mount prism into spectrograph CLOSED
  • assemble grating platform hardware
  • mount grating platform in spectrograph
  • install oil plumbing and felt to catch drips
  • Mount shutter assembly CLOSED
  • Rework baffle between L6 and prism

Cart & Handling

  • Get floor brakes and install on main blue cart CLOSED
  • Get presto scissor cart or other lifting solution for counterweights CLOSED
  • Get jack screws and install in main cart CLOSED
  • install trailer hitch on main blue cart
  • Procure extensions to alignment frame CLOSED
  • paint extensions to alignment frame CLOSED
  • Get Velcro and other supplies for tent
  • spectrograph covers

Electro/Mechanical

  • install shutter motor + solenoid
  • Cycle test shutter
  • practice insertion of slits, and document
  • set limits for guide camera focus stage CLOSED
  • set limits for L1 stage CLOSED
  • temptrax temperature sensors -- find them, install, test software
  • install UV LEDs CLOSED
  • cycle test comp lamp flip mirror CLOSED
  • Make Th-Ar to power supply cable
  • Make cables for cal box CLOSED
  • Talk to Dwane about temperature readout in pit
  • Cable drape on telescope
  • Nozzles for purge
  • Apply rubber between rear dewar righ and dewar to tighten connection
  • Install rear ring to dewar
  • Plastic Sheet around Guide Camera (?)
  • Mount spectrograph control electronics box
  • Mount CCD control electronics box

Logistics of Run

  • Schedule of who will be there when
  • reserve rooms
  • checklist of CCD tests, spectrograph tests, on-sky tests CLOSED
  • Rodger Thompson's check list for observing block
  • standards; science targets
  • TO for weekend CLOSED
  • Arrange for Truck CLOSED
  • Avoiding temperature shock CLOSED
  • keeping everything clean
  • transport of alignment frame
  • transport of dewar, dewar cart
  • transport of counterweights
  • Check and Box up misc. hardware for run

Documentation

  • PASP article
  • draft mount proceedure
  • draft dismount proceedure
  • draft mount checklist
  • draft dismount checklist

Software

  • Run ICE to control CCD and shutter CLOSED
  • Fits header keywords
  • Ruby control gui -- why does it crash?
  • Quick look software for run
    • focus
    • sextractor, sm routines for optical tests
    • Zemax on mountain? IDEAS?
    • MEF conversion
    • extraction
    • th-ar solution
    • WCS for wavelenghts -- IRAF transform in 2dspec

- Main.jill - 11 Jun 2007

Edit | WYSIWYG | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r6 < r5 < r4 < r3 < r2 | More topic actions

tip TWiki Tip of the Day
Revision control
TWiki has "Soft security" anyone can change anything, but changes are logged. There is a complete ... Read on Read more

 
Powered by TWiki
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback